Home / About Us / News

Product Category

Add : No. 94, Shangzha Road, Houjie Town, Dongguan, Guangdong
Tel : +86-769-8831-6780
Phone : +86-159-8991-5727

Read the latest news from the EMAX Load Bank team

  • 2024-09-23

    Can Liquid-Cooled Load Banks Be Customized?
    When it comes to power testing and simulation, load banks play a crucial role in ensuring that systems perform reliably under real-world conditions. Among the various types of load banks available, liquid-cooled load banks are increasingly becoming a preferred choice for high-power applications.
  • 2024-09-18

    What is a 4-Hour Load Bank Test?
    All generators have to have a 4-hour load test once every 3 years. This 4-hour load test must operate the generator at least 30% of the nameplate rating for 4 continuous hours, which again it appears you can meet without any difficulty.
  • 2024-09-12

    What are the advantages of liquid-cooled load banks?
    In the field of power testing and load management, load banks play a vital role in ensuring that systems operate at optimal efficiency. These systems simulate power loads to test, support or protect power sources such as generators, UPS systems or turbines.
  • 2024-09-10

    Load Bank Solutions: Bridging the Gap Between Testing and Reliability
    In today’s fast-paced technological landscape, ensuring the reliability and efficiency of power systems is paramount. Load bank solutions have emerged as a critical tool for industries relying on backup power sources, such as generators and uninterruptible power supplies (UPS). These solutions not o
  • Total 22 pages  Go to Page
  • Go

Products

Navigation

Contact us

  +86-769-8831-6780
  +86-15099752515(Mr. Jiang)
   sales05@emaxgroups.com
    No. 94, Shangzha Road, Houjie Town, Dongguan, Guangdong
Send Us A Message
Copyright @2022 Guangdong Emax Electrical Co., Ltd. All Rights Reserved. Sitemap Support By Leadong Privacy Policy